01/18
417000, square feet of building space divided into 6 garage buildings including underground parking facilities, and 25 buildings with approximately 320 living units.
A new 80 million gallons per day water purification plant with over $130m project cost was led by our CEO, Dominic Gbenoba, PE among other infrastructure projects such as roads and bridges that he handled as Chief Engineer, City of Houston Department of Public Works. Mr. Gbenoba adapted the Engineering, Procurement and Construction (EPC) delivery methodology as Project Manager/Chief of Operations.
Extension and Remodeling of the Airport Terminal, Runway Rehabilitation creating 10 new Check-Ins and the Construction of the East Access Ramp. Leros Greece.
A new multi-family development consisting 11 units with a mix of 2, 3 and 4 bedroom units each en-suite with a penthouse suite.
Amenities include a swimming pool, gatehouse
with security apparatus and ample parking. In Ikoyi, Lagos. Nigeria
The construction project for the New Ribeira d'Água Bridge surged following the collapse of the old bridge, bearing the same name, destroyed by the intense floods of 26 September 2012. Boavista Island, Cape Verde,